COPPER GEL EARTHINGS - MEDIUM DUTY
3E Solutions is Copper Gel Earthings manufacturer in Jaipur and is also supplier in Jaipur and all Rajasthan for best quality. Our earthings are successfully tested at CPRI Banglore and is also awarded ISO certification for quality supply. Our products are supplied in Tata, L&T, JECC, Mahatma Gandhi Hospital, Bombay Hospital and many premier institutions in Jaipur.
Copper Gel Earthings 80x3-Medium
Copper Gel Earthings Price in Medium Duty 80×3 – Rs 8000/
80×3 Copper Gel Earthings pecifications:
1. Copper Earthings Outer Pipe is of the Length 3 meter or 10 Feet in GI Pipe .
2. Outer Diameter of the Copper Earthings is 76 mm and Thickness is 2.5 mm
3. Terminal – 50×6 mm made of Copper
4. Primary Conductor made of Copper Strip 25×3 mm is all across the length
5 Material between Primary and secondary conductor is Conductive based on Bentonite.
6. Backfill Compound included is 2 Bags of 22 Kg each.
3E Solutions manufacture best copper gel earthings in Jaipur and entire Rajasthan which has Long Life and superior Thermal and Electrical properties.
Copper Gel Earthings -Commercial Terms and Conditions
1. Prices shall be finalised after knowing the final destination, Quanity and application of the use of the earthing.
2. The Prices, wherever quoted are exclusive of the Taxes / GST.
3. Freight- Extra as actual
4. Delivery : 140 Pcs per week. The final delivery will be informed in offer only.
5. Payment Terms : 100 % Advance (Upto 140 Pcs). For more, 30% Advance and balance including taxes and transportation, before dispatch against PI.
6. Installation: Only upon confirmation by Labour supplier. Excluded in offer in general. Installation instruction on risks, safety, availability of water as laid in here below to be strictly adhared. 3E Solutions provide copper gel earthing installation service in all Rajasthan including Ajmer, Bhilwara, Neemrana, Bhiwadi, Jodhpur and Kishangarh
Copper Gel Earthings Installation Instruction
1. Pl premix the backfill compound with water before filling in the augured hole of size not below 8 inch.
2. Cordinate with site owner/ site incharge for avoiding damage of Telecom/LT/HT electrical cables/Fibre optic lines/ sewerage / water etc lines
3. Minimum interfering hemisphere of – 2 meter ( pref equal to length of pipe ) shd be mother earth all around the pipe for better results. Maintain safe distance from sewerage line / basement and try to avoid loose soil ( refilled ) .
4. The manual digging work is job of unskilled labour. In factory premises where there is risk of high voltage, chemicals, explosives etc, the earthing installation work must be supervised by customer side safety incharge.
Safety - Precautions
1. Ensure no electrical, water , telecom or sewerage line below the site given for excavation. The manual work by labour to dig the hole involve sharp tools which may cut the cables and damage the pipe lines which may harm or cause civil liability.
2 Ensure availability of water at the site required for premixing.
3. Pl inform if the mother soil is not available without using machine work like in the case of road, RCC or Pucca floor where we want to install the earthing.